Viktor Lenac Shipyard has about 1,100 meters of berthing space inside the bay. All shipyard berths are equipped with shore cranes, having maximum lifting capacity of 100 tons.
Offshore construction area is approximately 130,000 sqm.
Berthing space alongside offshore construction area is 300 m.

Viktor-Lenac-Shipyard

Viktor Lenac Shipyard Docks Particulars

 

 

 

 

Shiprepair

  • Steel replacements
  • Anti-corosive protection
  • Drydock works
  • Mechanical works
  • Pipe renewals
  • Electrical works
  • Special services

 

Conversions

  • Pipe layers
  • Cable layers
  • Mega yacht restoration
  • Double skin installation
  • Lengthenings
  • Floating process unit
Offshore

  • Jack-up platform Labin
  • Gas platforms
  • Started in 1997
  • 17 gas platforms
  • Calm buoys